Ragingwire Data Centers Ca2 Sacramento is a data center in Sacramento, US. The facility is currently announced. It sits in the Sacramento data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 31.7-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Sacramento — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Sacramento — the market this facility sits in (full deep-dive →).
Sacramento's data center market comprises 57 tracked facilities totaling 391 MW, dominated by a fragmented operator base led by NTT, Prime, and RagingWire Data Centers, each operating 3–4 sites. The DCPI excess-power score of 71/100 signals substantial unutilized capacity across the region, while the constraint score of 54/100 indicates moderate but manageable infrastructure bottlenecks. This combination reflects a market with significant idle power available but real limitations on grid connectivity, cooling, or real estate that prevent simple deployment of that power. The CAUTION verdict should temper acquisition enthusiasm. High excess power typically signals either oversupply relative to near-term demand or undermonetized assets—both scenarios compress margins and slow ROI. The constraint score of 54/100, while not critical, means buyers cannot assume unlimited expansion headroom;…
Published DC Hub data for this location.
Comparable facilities in Sacramento tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="ragingwire-data-centers-ca2-sacramento-f987c84e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=ragingwire-data-centers-ca2-sacramento-f987c84e