Prime Sacramento is a data center operated by Prime Data Centers in Sacramento, CA, US. It carries a reported power capacity of 60.0 MW and is currently operational. It sits in the Sacramento data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 31.9-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Sacramento — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Sacramento — the market this facility sits in (full deep-dive →).
Sacramento's data center market is moderately constrained with adequate but not abundant power capacity: 44 tracked facilities totaling 440 MW are distributed across a fragmented operator landscape dominated by NTT 4 facilities, Prime 4, and RagingWire Data Centers 3, alongside Frontier Sacramento 3 and the NTT-RagingWire joint entity 3. The excess-power score of 71/100 indicates sufficient generation relative to current demand, but the constraint score of 54/100 signals meaningful friction in land, cooling, or interconnection availability—placing Sacramento squarely in the middle band of U.S. markets. No recent M&A activity has been tracked in the region, suggesting either market saturation among incumbents or investor hesitation over expansion economics. The CAUTION verdict reflects a mixed risk profile for acquisition-focused investors. Unlike AVOID markets Washington DC at 65/100…
Published DC Hub data for this location.
Comparable facilities in Sacramento tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="prime-data-centers-prime-sacramento-09ec654f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=prime-data-centers-prime-sacramento-09ec654f