QTS NEW ALBANY I, LLC is a data center in OHIO, OH. It sits in the Canton data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 25.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Canton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Canton — the market this facility sits in (full deep-dive →).
Canton's data center market is severely undersupplied and operationally constrained. The five tracked facilities totaling 1,000 MW are distributed across five operators, with Amazon Web Services commanding the largest footprint at two facilities. The excess-power score of 39/100 indicates acute scarcity of available capacity, while the constraint rating of 35/100 signals that existing infrastructure faces material operational limitations—likely tied to aging grid interconnection, limited fiber availability, or cooling/water constraints typical of Ohio industrial markets. The AVOID verdict is unambiguous for acquisition-stage investors. A combined excess-power and constraint score below 40/100 each disqualifies Canton from near-term deployment capital allocation. Unlike legacy asset plays in Washington, DC—where constrained markets can occasionally support margin arbitrage on older…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in OHIO tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="qts-new-albany-i-llc-7b9fe4c0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect