PowerHouse Digital Drive (Chesterfield)

PowerHouse Digital Drive (Chesterfield) is a data center operated by PowerHouse Data Centers in Chesterfield, VA, US. The facility is currently under construction. It sits in the Chester data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 30.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Under Construction
Market
Chesterfield
State
VA
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Chester — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Chester — the market this facility sits in (full deep-dive →).

Chester's data center market remains nascent and severely undercapitalized. Seven tracked facilities operate across the region, but they collectively represent zero megawatts of deployable capacity—a material gap that signals either early-stage development, incomplete reporting, or fundamental infrastructure deficits. PowerHouse operates two sites, the largest footprint in the market, while CoreWeave, Digital Fortress, nLighten HQ BV, and an unidentified operator each maintain single facilities. The absence of any recent M&A activity underscores investor hesitancy toward the region. The DCPI verdict of AVOID is unambiguous and rooted in twin constraints. An excess-power score of 47/100 indicates the grid cannot reliably support incremental hyperscale demand, while a constraint rating of 44/100 signals acute transmission or interconnection bottlenecks. This pairing—neither metric…

Location

Area Chesterfield, VA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketChester
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power30.9 months
LocationChesterfield, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 35 operating generating units totalling 3,432 MW within about 50 km of Chesterfield, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,641 MW · 14 units · 77%
Utility-Scale Solar673 MW · 19 units · 20%
Bioenergy119 MW · 2 units · 3%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Chesterfield tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="powerhouse-data-centers-powerhouse-digital-drive-chesterfield-25315ba5" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind