Ponto de Presença da Rede Nacional de Ensino e Pesquisa no Estado do Paraná RNP/POP-PR

Ponto de Presença da Rede Nacional de Ensino e Pesquisa no Estado do Paraná

RNP/POP-PR is a data center operated by Ponto de Presença da Rede Nacional de Ensino e Pesquisa no Estado do Paraná in Curitiba, PR, BR. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the San Juan data-center market on the PREPA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 67.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
3.0 MW
Status
Operational
Market
Curitiba
State
PR
Country
BR
Coordinates
-25.4475, -49.2328

Market intelligence

AVOID

Data Center Power Index verdict for San Juan — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on San Juan — the market this facility sits in (full deep-dive →).

San Juan's data center market remains fragmented and undersized, with just 10 tracked facilities delivering 21 MW of total capacity across a five-operator ecosystem. The market is dominated by telecom incumbents—Claro operates three separate entities Claro, Claro Puerto Rico, and Claro-PRTC—while Critical Hub Networks and Amplia each operate single facilities. This operator concentration around legacy telecom assets reflects Puerto Rico's unique regulatory and infrastructure history, where fixed-line carriers built early data center capabilities as natural extensions of network operations rather than as purpose-built colocation platforms. The DCPI verdict—excess-power 10/100 and constraint 67/100—explicitly signals AVOID for acquisition-focused investors. The excess-power score of 10/100 indicates severe scarcity of available electrical capacity; at only 21 MW tracked across the entire…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketSan Juan
Grid operatorPREPA
DC Hub Power IndexAVOID
Est. time to power67.5 months
LocationCuritiba, BR
Reported capacity3.0 MW

Other data centers nearby

Comparable facilities in Curitiba tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 17,000+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="ponto-de-presena-da-rede-nacional-de-ensino-e-pesquisa-no-estado-do-paran-rnppop-pr-3ccb153a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=ponto-de-presena-da-rede-nacional-de-ensino-e-pesquisa-no-estado-do-paran-rnppop-pr-3ccb153a