Parsec

Parsec is a data center operated by Parsec Data Management, Inc in Billings, MT, US. The facility is currently operational. It sits in the Billings data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 7.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Billings
State
MT
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Billings — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Billings — the market this facility sits in (full deep-dive →).

Billings remains a nascent, underutilized market with minimal infrastructure density and acute operational constraints. The tracked portfolio comprises just 8 facilities totaling 0 MW of measured capacity, indicating either severely limited deployments or incomplete data capture across the region. Iconnect Montana Billings operates the largest footprint with 2 tracked sites, while Cogent Communications, Parsec Data Management, and YRIX each maintain single-facility presences. The fragmented operator base—dominated by regional and mid-tier players rather than hyperscale incumbents—reflects Billings' peripheral status in the national data center hierarchy. The DCPI verdict of excess-power 48/100 coupled with constraint 23/100 signals a market to avoid for capital deployment. The moderate excess-power score suggests either underutilized generation capacity or structural grid limitations…

Location

Area Billings, MT, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBillings
Grid operatorWECC
Data Center Power IndexAVOID
Est. time to power7.3 months
LocationBillings, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Parsec in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

TCT West, Inc.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 5 operating generating units totalling 635 MW within about 50 km of Billings, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Hydropower278 MW · 1 unit · 44%
Oil/Gas275 MW · 2 units · 43%
Utility-Scale Solar80 MW · 1 unit · 13%
Wind2 MW · 1 unit · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Billings tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="parsec-data-management-inc-parsec-c222c087" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind