Oracle/OpenAI Texas is a data center operated by Oracle/OpenAI in TX, US. It carries a reported power capacity of 800.0 MW and is currently planned. It sits in the Midland–Odessa data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 9.6-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Midland–Odessa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Midland–Odessa — the market this facility sits in (full deep-dive →).
The Midland–Odessa market currently hosts 50 MW across 8 tracked facilities, establishing a modest but operationally active hub. The region's operator base remains fragmented, with five distinct entities each running single facilities—Crusoe Energy, Hosting UA Odessa, Od IX Odessa, Unit IS Odessa, and Wildpark Nikolaev—indicating no dominant incumbent. This distributed ownership structure contrasts with consolidation patterns visible in stronger Texas markets like El Paso, where larger operators command greater market share and asset concentration. The BUILD verdict, driven by an excess-power score of 85/100, signals genuine infrastructure opportunity for capital deployment. The constraint score of 22/100 confirms that power availability—not real estate, fiber, or cooling—is the binding resource, and the Midland–Odessa region possesses substantial unutilized generating capacity or grid…
Published DC Hub data for this location.
Comparable facilities in TX tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="oracleopenai-oracleopenai-texas-eb9428f1" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=oracleopenai-oracleopenai-texas-eb9428f1