Oracle/OpenAI Ohio is a data center operated by Oracle/OpenAI in OH, US. It carries a reported power capacity of 600.0 MW and is currently planned. It sits in the Canton data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Canton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Canton — the market this facility sits in (full deep-dive →).
Canton's data center ecosystem comprises five facilities totaling 1,000 MW of capacity, anchored by dual AWS presence and three regional operators LightSpeed Technologies, SecureData 365, and ark data centers, but faces a critical infrastructure bottleneck. The DCPI scoring—excess-power at 39/100 paired with constraint at 39/100—reflects a market saturated relative to available power supply, with neither surplus capacity nor meaningful flexibility for expansion. This symmetric low score is a red flag: operators cannot reliably scale workloads during peak demand, and new entrants cannot easily access power allocations without displacing existing tenants. The AVOID verdict is unambiguous for acquisition-focused investors. A constraint score of 39/100 means Canton's power infrastructure cannot dependably support the hyperscaler migration patterns or high-density AI workload clustering that…
Published DC Hub data for this location.
Comparable facilities in OH tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="oracleopenai-oracleopenai-ohio-6f9aa643" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=oracleopenai-oracleopenai-ohio-6f9aa643