NRG Texas is a data center operated by NRG in TX, US. It carries a reported power capacity of 1200.0 MW and is currently planned. It sits in the Irving data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 59.8-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Irving — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Irving — the market this facility sits in (full deep-dive →).
Irving's data center market comprises 661 MW across 12 tracked facilities, dominated by QTS and its affiliated entities, which operate 8 of the tracked properties. The market's DCPI verdict of CAUTION reflects a bifurcated constraint profile: excess-power availability at 65/100 suggests near-term supply headroom, but a constraint score of 59/100 signals emerging infrastructure bottlenecks that will tighten faster than raw MW availability indicates. This divergence is the core tension defining Irving's risk profile for the next 18–24 months. For acquisition-stage investors, the CAUTION verdict demands discipline around transaction timing and asset stage. The constraint score of 59/100—similar to Dallas's profile—indicates that power delivery infrastructure, not generation capacity, represents the primary expansion friction. Unlike markets with scores above 65/100, Irving cannot absorb…
Published DC Hub data for this location.
Comparable facilities in TX tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="nrg-texas-b853db94" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=nrg-texas-b853db94