noris network Rechenzentrum Nürnberg Süd

Last updated

Rechenzentrum Nürnberg Süd is a data center operated by noris network in Nuremberg, Bavaria, DE. The facility is currently operational. It sits in the Munich data-center market on the ENTSOE-DE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 79.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Nuremberg
State
Bavaria
Country
DE

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Munich — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Munich — the market this facility sits in (full deep-dive →).

Munich's data center market remains undersized and constrained, with 87 tracked facilities delivering just 6 MW of capacity across a fragmented operator base. Equinix dominates with four facilities, while Eunetworks, EdgeConneX, and Finanz Informatik each operate two sites. Despite being Germany's second-largest city and a major tech hub, Munich's installed base is negligible compared to Frankfurt and Berlin, reflecting decades of underinvestment in purpose-built colocation infrastructure. Recent development signals—including Equinix's completion of its MU4 expansion and M-net's commitment to a new site opening in 2028—suggest movement, but from a minimal baseline. The DCPI verdict of AVOID is decisive for acquisition-focused investors. The excess-power score of 22/100 indicates severe undersupply; available power capacity is scarce and will constrain operations immediately. The…

Location

Area Nuremberg, Bavaria, DE

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMunich
Grid operatorENTSOE-DE
Data Center Power IndexAVOID
Est. time to power79.5 months
LocationNuremberg, DE

Fiber connectivity

Networks recorded as present at or immediately around Rechenzentrum Nürnberg Süd in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

ADESTISADITSYSTEMSBisping & Bisping GmbH & Co. KGBrandl Services GmbHCore-BackboneF3 NetzeN-IX ServicesNFON AGPANEMProact Deutschland GmbH (formerly teamix GmbH)Wavecon GmbHintibu

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 456 operating generating units totalling 3,614 MW within about 50 km of Nuremberg, DE. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar2,190 MW · 426 units · 61%
Oil/Gas1,064 MW · 5 units · 29%
Wind360 MW · 25 units · 10%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Nuremberg tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="noris-network-rechenzentrum-nrnberg-sd-2b2094cb" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind