Newrays Two LLC Mining is a data center in US. The facility is currently operational. It sits in the Clarksville data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Clarksville — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Clarksville — the market this facility sits in (full deep-dive →).
Clarksville's data center market remains nascent, with 160 MW across 4 tracked facilities dominated entirely by Google entities 3 facilities under Google, 1 under Google LLC. The market has attracted substantial municipal backing—officials approved up to $55 billion in bonds to support a planned $6.6 billion data center investment—yet this development ambition masks critical infrastructure constraints. Recent reporting indicates the proposed campus will require approximately 5 times more power than the local utility can currently deliver, a structural bottleneck that defines the market's near-term viability. The DCPI verdict of AVOID reflects genuine operational friction for prospective investors. With an excess-power score of 35/100 and constraint score of 24/100, Clarksville signals insufficient headroom for incremental capacity deployment without major grid upgrades. The low…
Published DC Hub data for this location.
DC Hub tracks 29 operating generating units totalling 2,258 MW within about 50 km of US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="newrays-two-llc-mining-newrays-two-llc-mining-13a223d4" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect