Netia Data Center MIND

Netia Data Center MIND is a data center operated by Netia S.A. in Jawczyce, PL. The facility is currently operational. It sits in the Warsaw data-center market on the ENTSOE-PL grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 69.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Jawczyce
Country
PL

Market intelligence

AVOID

Data Center Power Index verdict for Warsaw — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Warsaw — the market this facility sits in (full deep-dive →).

Warsaw's data center footprint remains modest at 45 MW across 125 tracked facilities, concentrated among a fragmented operator base led by Equinix with a combined 10 MW, followed by Vantage Data Centers and EdgeConneX Inc. each holding 4 MW. The market is dominated by smaller independents—notably an "Unknown" category with 4 MW—signaling low consolidation and persistent opacity in ownership structures typical of emerging Eastern European hubs. Power infrastructure development lags demand: the excess-power score of 22/100 indicates severe undersupply relative to regional benchmarks, while the constraint score of 63/100 reflects moderate but material operational friction in grid access and redundancy provisioning. The DCPI verdict of AVOID is unambiguous for acquisition-stage capital. A power excess score of 22/100 paired with constraint at 63/100 creates a compounding risk profile:…

Location

Area Jawczyce, PL

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketWarsaw
Grid operatorENTSOE-PL
Data Center Power IndexAVOID
Est. time to power69.5 months
LocationJawczyce, PL

Fiber connectivity

Networks recorded as present at or immediately around Netia Data Center MIND in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Fiberax Networking & Cloud AS31445Fiberax Networking & Cloud AS3252Giganet IXN - Ukrainian Backbone NetworksInternet Invest AS21343Internet Invest AS25393NetiaOmega TelecomT-BandTELNAP TELECOMVolz

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 92 operating generating units totalling 1,897 MW within about 50 km of Jawczyce, PL. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal1,177 MW · 8 units · 62%
Oil/Gas490 MW · 1 unit · 26%
Wind138 MW · 5 units · 7%
Utility-Scale Solar92 MW · 78 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Jawczyce tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="netia-sa-netia-data-center-mind-e238de84" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind