ACS North Wire Center is a data center operated by National Oceanic and Atmospheric Administration in Anchorage, AK, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Anchorage data-center market on the AK grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Anchorage — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Anchorage — the market this facility sits in (full deep-dive →).
Anchorage's data center footprint remains minimal and structurally constrained. The market comprises only 2 tracked facilities totaling 6 MW, representing a severely underdeveloped infrastructure base. Operator diversification is nonexistent: AlasConnect operates a single facility while NOAA controls another, creating no competitive tension or operational synergies. The fragmented ownership structure reflects the market's early-stage nature and limited institutional investment to date. The DCPI verdict of AVOID is unambiguous and rooted in two critical failures. The excess-power score of 48/100 indicates insufficient power redundancy and availability relative to market demand—a disqualifying factor for hyperscale or mission-critical workloads that require N+1 or N+2 redundancy architecture. The constraint score of 41/100 signals severe operational limitations, likely stemming from…
Published DC Hub data for this location.
Comparable facilities in Anchorage tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="national-oceanic-and-atmospheric-administration-acs-north-wire-center-deac8104" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=national-oceanic-and-atmospheric-administration-acs-north-wire-center-deac8104