Microsoft

Last updated

Microsoft is a data center in Guaynabo, PR, PR. The facility is currently operational. It sits in the San Juan data-center market on the PREPA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 65.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Guaynabo
State
PR
Country
PR

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for San Juan — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on San Juan — the market this facility sits in (full deep-dive →).

San Juan's data center market remains nascent and fragmented, with 35 tracked facilities totaling zero operational megawatts and leadership split among five operators—Amplia, Claro, Claro Puerto Rico, Claro San, and Aeronet Mop18n—each managing only a single facility. The market exhibits acute infrastructure constraints that override any theoretical growth potential. The DCPI scoring reflects this reality: excess-power capacity registers at just 10/100, while grid constraint severity scores 62/100, yielding a composite AVOID verdict that demands strict investor discipline. The AVOID rating disqualifies San Juan for acquisition or greenfield expansion under current conditions. The 62/100 constraint score indicates material grid limitations that restrict both buildout speed and operational flexibility; investors cannot rely on rapid scaling or redundancy options. With excess-power at only…

Location

Street Avenida El Caño
Area Guaynabo, PR, PR

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketSan Juan
Grid operatorPREPA
Data Center Power IndexAVOID
Est. time to power65.9 months
LocationGuaynabo, PR
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Microsoft in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

4NETPRCONEXFiberNetPRFiberXFiberX-PRFuse TelecomHRCOMIHSJR NetworksMASTER-IT-SUPPORTMicrosoftNOVANET PR

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 27 operating generating units totalling 1,828 MW within about 50 km of Guaynabo, PR. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,592 MW · 11 units · 87%
Wind127 MW · 2 units · 7%
Utility-Scale Solar109 MW · 14 units · 6%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Guaynabo tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="microsoft-guaynabo-8f2498ea" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind