COLO 2 is a data center operated by Microsoft in Quilicura, CL. The facility is currently operational. It sits in the Santiago data-center market on the CEN grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 29.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Santiago — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Santiago — the market this facility sits in (full deep-dive →).
Santiago's data center market comprises 152 tracked facilities totaling 18 MW across a fragmented operator landscape, with a DCPI verdict of CAUTION driven by excess-power availability 54/100 paired with moderate grid constraints 49/100. The market is dominated by unknown operators controlling 11 MW, followed by an unnamed operator with 8 MW, and established players Microsoft 5 MW, GTD Internet 4 MW, and Ascenty DataCenters e Telecom 4 MW. The absence of recent M&A activity signals either market maturity, limited seller appetite, or investor hesitation—a meaningful data point for anyone evaluating entry timing. The CAUTION verdict reflects a market in tension: adequate but not abundant power supply meets meaningful infrastructure constraints that prevent aggressive expansion. Unlike markets rated AVOID such as Sandston at 47/100 on both dimensions, Santiago's balanced constraint score…
Published DC Hub data for this location.
Networks recorded as present at or immediately around COLO 2 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 94 operating generating units totalling 2,874 MW within about 50 km of Quilicura, CL. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Quilicura tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="microsoft-colo-2-63948936" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect