Azure Spain Central Madrid is a data center operated by Microsoft in Madrid, ES. The facility is currently operational. It sits in the Madrid data-center market on the ENTSOE-ES grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 69.1-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Madrid — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Madrid — the market this facility sits in (full deep-dive →).
Madrid's data center infrastructure spans 125 tracked facilities totaling 175 MW, anchored by a competitive operator base led by Digital Realty with four sites, alongside three-site presences from Equinix, Asociación ESpanix, and Nabiax. The market exhibits structural imbalance: excess-power availability scores only 32/100, indicating tight supply relative to demand, while power-constraint risk scores 61/100—a material threshold suggesting infrastructure bottlenecks that limit expansion velocity. This combination reflects a maturing market where incremental capacity commands premium pricing but faces real grid connectivity friction. The DCPI verdict of AVOID carries explicit weight for acquisition-focused investors. The constraint score of 61/100 signals that operators cannot freely deploy additional load even when land and cooling exist; electrical infrastructure upgrades require…
Published DC Hub data for this location.
Networks recorded as present at or immediately around Azure Spain Central Madrid in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 70 operating generating units totalling 757 MW within about 50 km of Madrid, ES. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Madrid tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="microsoft-azure-spain-central-madrid-3998e410" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect