Meta Sturgeon Data Centre

📍
Last updated

Sturgeon Data Centre is a data center operated by Meta. It sits in the Edmonton data-center market on the AESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Edmonton — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Edmonton — the market this facility sits in (full deep-dive →).

Edmonton's data center market remains nascent and fragmented, with 21 tracked facilities totaling zero operational megawatts and five operators each holding single-facility portfolios. The market is dominated by smaller regional players—Alentus Corporation Edmonton, Axia Edmonton, Axia Sherwood, Colliers International, and 4Web—none of which have achieved meaningful scale or geographic concentration. This operator atomization reflects the absence of institutional capital inflow and suggests the market has not yet attracted hyperscale or investment-grade facility operators. The AVOID verdict, driven by an excess-power score of 43/100 coupled with a severe constraint score of 27/100, indicates a fundamental mismatch between available infrastructure and investable capacity. The low constraint score signals insufficient power delivery infrastructure to support facility expansion or new…

Location

Street Range Road

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketEdmonton
Grid operatorAESO
Data Center Power IndexAVOID
Est. time to power11.3 months

Power generation nearby

DC Hub tracks 12 operating generating units totalling 822 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas738 MW · 8 units · 90%
Utility-Scale Solar84 MW · 4 units · 10%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="meta-sturgeon-data-centre-e6136f9a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind