Meta Mesa Building 5 is a data center operated by Meta Platforms in Mesa, AZ, US. It carries a reported power capacity of 40.0 MW and is currently under construction. It sits in the Mesa data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 13.2-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Mesa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Mesa — the market this facility sits in (full deep-dive →).
Mesa's data center market is moderately powered but significantly constrained, with 53 tracked facilities totaling 1,425 MW operated across a fragmented landscape. The DCPI excess-power score of 67/100 indicates adequate capacity availability, but the constraint rating of 44/100 reveals material limitations in grid connectivity, real estate, or permitting that will shape near-term development. Despite these headwinds, the BUILD verdict signals that new capacity deployment remains economically justified for investors willing to navigate Mesa's friction points. For acquisition-focused buyers, the DCPI verdict demands selectivity rather than prohibition. The constraint score of 44/100 is high enough to discourage speculative land-banking or passive portfolio holds, but the 67/100 power availability means new operators can still achieve operational efficiency within 18–24 months of…
Published DC Hub data for this location.
Comparable facilities in Mesa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-platforms-meta-mesa-building-5-b45f69e6" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-platforms-meta-mesa-building-5-b45f69e6