Meta Hyperion Building 2

Meta Platforms

Meta Hyperion Building 2 is a data center operated by Meta Platforms in Richland Parish, LA, US. It carries a reported power capacity of 555.0 MW and is currently under construction. It sits in the Richland Parish data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 18.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
555.0 MW
Status
Under Construction
City
Richland Parish
State
LA
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Richland Parish — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Richland Parish — the market this facility sits in (full deep-dive →).

Richland Parish hosts 22 tracked facilities totaling 19,500 MW of capacity, dominated almost entirely by Meta's dual operating entities. Meta operates 13 MW directly while Meta Platforms controls an additional 9 MW, consolidating roughly 100% of the tracked operator base in this parish. This extreme concentration around a single buyer creates a captive market dynamic with limited competitive tension. The infrastructure base exists primarily to serve Meta's expansion roadmap rather than a diversified tenant ecosystem. The DCPI verdict of AVOID is justified by two material constraints. The excess-power score of 44/100 signals tight supply margins—the region cannot reliably absorb incremental load growth without major grid upgrades. More critically, the constraint score of 38/100 represents severe infrastructure friction; this is a lower constraint rating than peer markets like New York…

Market & grid context

Published DC Hub data for this location.

MarketRichland Parish
Grid operatorMISO
DC Hub Power IndexAVOID
Est. time to power18.5 months
LocationRichland Parish, US
Reported capacity555.0 MW

Other data centers nearby

Comparable facilities in Richland Parish tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="meta-platforms-meta-hyperion-building-2-d427fce6" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=meta-platforms-meta-hyperion-building-2-d427fce6
Schema, units and the population behind every count: https://dchub.cloud/bind