Meta Eagle Mountain Building 2 is a data center operated by Meta Platforms in Eagle Mountain, UT, US. It carries a reported power capacity of 50.0 MW and is currently planned. It sits in the Eagle Mountain data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.8-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Eagle Mountain — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Eagle Mountain — the market this facility sits in (full deep-dive →).
Eagle Mountain hosts 700 MW across 10 tracked facilities, anchored by Meta's four properties and complemented by Google, QTS, and two unidentified operators. The market's DCPI score of 55/100 on excess power paired with 46/100 on constraint signals a bifurcated risk profile: adequate near-term capacity exists, but infrastructure bottlenecks loom as utilization climbs. This is neither a power-constrained market like Eagan nor a dormant one—Eagle Mountain sits in a precarious middle ground requiring disciplined deployment. The caution verdict reflects genuine tension between supply and demand vectors. An excess-power score of 55/100 suggests Eagle Mountain is not facing acute power scarcity today, but the constraint rating of 46/100—below the midline—indicates that transmission, cooling, or interconnection infrastructure is already absorbing incremental capacity additions. For buyers,…
Published DC Hub data for this location.
Comparable facilities in Eagle Mountain tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-platforms-meta-eagle-mountain-building-2-0dadae2d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-platforms-meta-eagle-mountain-building-2-0dadae2d