Meta Eagle Mountain Building 1 is a data center operated by Meta in Eagle Mountain, UT, US. It carries a reported power capacity of 50.0 MW and is currently under construction. It sits in the Eagle Mountain data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.8-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Eagle Mountain — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Eagle Mountain — the market this facility sits in (full deep-dive →).
Eagle Mountain's data center market is consolidating around hyperscale operators, with 700 MW across 10 tracked facilities dominated by Meta's dual presence 6 of 10 facilities. The market's DCPI verdict of BUILD reflects a favorable 53/100 excess-power score that outweighs a moderate 47/100 constraint rating, signaling room for new capacity deployment without immediate infrastructure bottlenecks. Meta's controlling position—spanning both Meta corporate and Meta Platforms entities—underscores the region's appeal to the largest cloud operators, while the remaining four facilities are split among Google, QTS, and unidentified operators, indicating a three-to-four player competitive structure rather than true fragmentation. For acquisition-focused investors, the BUILD verdict presents a contrarian opportunity relative to constrained peer markets like Douglasville DCPI: AVOID, constraint…
Published DC Hub data for this location.
Comparable facilities in Eagle Mountain tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-meta-eagle-mountain-building-1-58498b0f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-meta-eagle-mountain-building-1-58498b0f