Meta Stanton Springs Building 5 is a data center operated by Meta in Social Circle, GA, US. It carries a reported power capacity of 40.0 MW and is currently under construction. It sits in the Social Circle data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 29.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Social Circle — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Social Circle — the market this facility sits in (full deep-dive →).
Social Circle's data center footprint remains modest but strategically consolidated, with 80 MW across three tracked facilities dominated by Meta's dual-site presence. The market's operator concentration—Meta controls two of three facilities—reflects the typical pattern of hyperscaler consolidation in smaller regional markets, where economies of scale favor established players with existing footprints. This limited facility count and narrow operator base suggest a maturing market with low competitive churn rather than a growth corridor attracting new entrants. The DCPI verdict of AVOID carries material weight for acquisition-focused investors. With excess-power scoring just 32/100, Social Circle faces genuine headroom constraints; the 43/100 constraint rating signals that grid infrastructure or interconnection limitations are already binding investment decisions. Combined, these scores…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Social Circle tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-meta-stanton-springs-building-5-4856c1e2" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect