Meta Hyperion Building 8

Meta

Meta Hyperion Building 8 is a data center operated by Meta in Richland Parish, LA, US. It carries a reported power capacity of 555.0 MW and is currently planned. It sits in the Richland Parish data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 18.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
555.0 MW
Status
Planned
Market
Richland Parish
State
LA
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Richland Parish — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Richland Parish — the market this facility sits in (full deep-dive →).

Richland Parish hosts a concentrated but constrained data center footprint, with 22 tracked facilities totaling 19,500 MW dominated by Meta's dual-entity presence. The market's DCPI scoring—45/100 for excess power capacity and 37/100 for constraint relief—reflects a fundamental supply-demand imbalance that presents material risk to investors. Meta operates 13 facilities while Meta Platforms controls an additional 9, establishing near-total operator concentration in a parish where infrastructure growth has not kept pace with deployment velocity. The AVOID verdict on Richland Parish reflects hard constraints on both entry and expansion. An excess-power score of 45/100 signals insufficient incremental capacity headroom relative to existing and pipeline demand; the constraint score of 37/100 indicates limited near-term relief mechanisms through grid reinforcement, water availability, or…

Market & grid context

Published DC Hub data for this location.

MarketRichland Parish
Grid operatorMISO
DC Hub Power IndexAVOID
Est. time to power18.4 months
LocationRichland Parish, US
Reported capacity555.0 MW

Other data centers nearby

Comparable facilities in Richland Parish tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 17,000+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="meta-meta-hyperion-building-8-666cfaf0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=meta-meta-hyperion-building-8-666cfaf0