Meta Mesa Building 4

Meta

Meta Mesa Building 4 is a data center operated by Meta in Mesa, AZ, US. It carries a reported power capacity of 40.0 MW and is currently under construction. It sits in the Mesa data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 13.2-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Power
40.0 MW
Status
Under Construction
Market
Mesa
State
AZ
Country
US

Market intelligence

BUILD

Data Center Power Index verdict for Mesa — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Mesa — the market this facility sits in (full deep-dive →).

Mesa's data center market is moderately developed with 53 tracked facilities representing 1,431 MW of capacity, but remains fragmented across numerous operators with no clear market leader. The top-5 operators control only 19 facilities combined, with 13 facilities attributed to unknown operators, indicating a highly distributed competitive landscape. EdgeCore Digital Infrastructure and EdgeCore collectively operate 8 facilities, while Meta maintains a smaller 3-facility footprint in the region. The DCPI verdict of BUILD reflects a market positioned favorably for greenfield development rather than acquisition. With an excess-power score of 69/100 against a constraint score of 44/100, Mesa presents sufficient grid capacity and power availability to support new construction without the infrastructure bottlenecks plaguing capacity-constrained markets. This profile favors operators and…

Market & grid context

Published DC Hub data for this location.

MarketMesa
Grid operatorWECC
DC Hub Power IndexBUILD
Est. time to power13.2 months
LocationMesa, US
Reported capacity40.0 MW

Other data centers nearby

Comparable facilities in Mesa tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 18,500+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="meta-mesa-building-4-256b832f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=meta-mesa-building-4-256b832f