Meta El Paso Building 1

Meta

Meta El Paso Building 1 is a data center operated by Meta in El Paso, TX, US. It carries a reported power capacity of 75.0 MW and is currently under construction. It sits in the El Paso data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 41.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
75.0 MW
Status
Under Construction
Market
El Paso
State
TX
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for El Paso — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on El Paso — the market this facility sits in (full deep-dive →).

El Paso's data center ecosystem remains dominated by Meta's sprawling footprint across 9 tracked facilities, anchoring a 2,673 MW regional installed base spread across 18 sites. The market is characterized by extreme operator concentration—Meta controls roughly half the tracked capacity—with secondary players including CenturyLink El Paso 2 facilities and fragmented MDC Data Centers holdings comprising the remainder. This oligopolistic structure reflects the region's historical appeal as a low-cost, power-abundant location, though recent infrastructure pressures have begun reshaping that calculus. The DCPI verdict of CAUTION warrants careful attention from both acquisition-focused and brownfield development investors. An excess-power score of 69/100 initially suggests healthy headroom, but the constraint index of 52/100 signals emerging bottlenecks—likely transmission or water-cooling…

Market & grid context

Published DC Hub data for this location.

MarketEl Paso
Grid operatorWECC
DC Hub Power IndexCAUTION
Est. time to power41.3 months
LocationEl Paso, US
Reported capacity75.0 MW

Other data centers nearby

Comparable facilities in El Paso tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 18,500+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="meta-el-paso-building-1-1c1a96dd" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=meta-el-paso-building-1-1c1a96dd