Meta Bowling Green Data Center

Meta

Meta Bowling Green Data Center is a data center operated by Meta in Luckey, OH, US. The facility is currently operational. It sits in the Luckey data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Luckey
State
OH
Country
US
Coordinates
41.4655, -83.6389

Market intelligence

AVOID

Data Center Power Index verdict for Luckey — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Luckey — the market this facility sits in (full deep-dive →).

Luckey remains a nascent market with minimal operational scale: only 4 tracked facilities totaling 3 MW across a fragmented operator base that includes Meta, Amplex Electric, and two other entities. This represents a greenfield-stage asset pool with no consolidation anchor and no recent M&A to signal institutional interest. The market's dual constraint—excess-power score of 39/100 paired with a constraint score of 39/100—reveals a paradox: while power availability is not the binding limitation, other infrastructure factors land, interconnection, cooling, or transmission are equally problematic. The AVOID verdict reflects a fundamental mismatch between acquisition risk and return potential. A constraint score of 39/100, though lower than severely bottlenecked markets like Washington DC 65/100, still indicates material friction in scaling operations. For buyers, this means development…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketLuckey
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power15.3 months
LocationLuckey, US

Other data centers nearby

Comparable facilities in Luckey tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 17,000+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="meta-bowling-green-data-center-e49c3653" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=meta-bowling-green-data-center-e49c3653