Data Center 11815482844 is a data center in Luckey, OH, US. The facility is currently operational. It sits in the Luckey data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Luckey — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Luckey — the market this facility sits in (full deep-dive →).
Luckey remains a nascent market with minimal operational scale: only 4 tracked facilities totaling 3 MW across a fragmented operator base that includes Meta, Amplex Electric, and two other entities. This represents a greenfield-stage asset pool with no consolidation anchor and no recent M&A to signal institutional interest. The market's dual constraint—excess-power score of 39/100 paired with a constraint score of 39/100—reveals a paradox: while power availability is not the binding limitation, other infrastructure factors land, interconnection, cooling, or transmission are equally problematic. The AVOID verdict reflects a fundamental mismatch between acquisition risk and return potential. A constraint score of 39/100, though lower than severely bottlenecked markets like Washington DC 65/100, still indicates material friction in scaling operations. For buyers, this means development…
Published DC Hub data for this location.
Comparable facilities in Luckey tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="data-center-11815482844-62dd101e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=data-center-11815482844-62dd101e