Locals Lombardy, It is a data center operated by Locals in Lombardy, It, US. It carries a reported power capacity of 240.0 MW and is currently planned. It sits in the Bologna data-center market on the ENTSOE-IT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 80.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Bologna — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Bologna — the market this facility sits in (full deep-dive →).
Bologna's data center market is micro-scale and severely constrained, with 12 tracked facilities totaling 0 MW of operational capacity. The DCPI verdict is unambiguously AVOID, driven by an excess-power score of 13/100—indicating acute power scarcity—paired with a constraint score of 61/100 that signals moderate infrastructure bottlenecks. This combination reflects a market where available power is functionally depleted and expansion headroom is minimal, making near-term growth operationally impractical. For acquisition-focused investors, the AVOID rating is categorical. The excess-power metric of 13/100 places Bologna in the critical scarcity band, comparable to constraint-driven markets where power availability is the binding operational constraint. This metric directly translates to inability to absorb new workloads or scale existing colocation services without substantial new power…
Published DC Hub data for this location.
get_facility slug="locals-lombardy-it-e6a55d86" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=locals-lombardy-it-e6a55d86