Liquid Web Data Center Three is a data center in Lansing, US. The facility is currently announced. It sits in the Lansing data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 28.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Lansing — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Lansing — the market this facility sits in (full deep-dive →).
Lansing's data center footprint remains nascent with 9 tracked facilities totaling 0 MW of measured capacity. The market exhibits fragmented operator control, with no single player dominating—Liquid Web operates three separate entities within the tracked base, while CMN-RUS, Inc. d/b/a Metronet and two unidentified operators each hold one facility. This fragmentation suggests an immature market where consolidation or capacity aggregation has not yet materialized, leaving Lansing without the infrastructure density typical of Tier-1 hub markets. The DCPI verdict of CAUTION reflects a market caught between opportunity and constraint. The excess-power score of 57/100 indicates moderate availability of utility power relative to current demand, which appears favorable on the surface. However, the constraint score of 51/100—nearly at equilibrium—signals structural limitations that will bind…
Published DC Hub data for this location.
Comparable facilities in Lansing tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="liquid-web-data-center-three-ba7bc874" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=liquid-web-data-center-three-ba7bc874