Liquid Web, Inc

Liquid Web, Inc is a data center in Lansing, MI, US. The facility is currently operational. It sits in the Lansing data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 28.4-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Lansing
State
MI
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Lansing — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Lansing — the market this facility sits in (full deep-dive →).

Lansing's data center market remains nascent and fragmented, with 9 tracked facilities totaling 0 MW of identifiable capacity—a stark indicator of infrastructure immaturity. The operator base is highly distributed across five distinct entities, with no single player commanding dominant control: Liquid Web and its affiliate entities operate multiple sites, while CMN-RUS, Inc. d/b/a Metronet and two unidentified operators round out the competitive landscape. This fragmentation mirrors early-stage markets where regional players fill service gaps before hyperscale consolidation. The DCPI verdict of "CAUTION"—driven by a 51/100 excess-power rating paired against a 49/100 constraint score—signals a precarious equilibrium. Excess power availability suggests near-term runway for incremental deployments, yet the constraint score indicates emerging supply-side friction. For acquisition-focused…

Location

Area Lansing, MI, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketLansing
Grid operatorMISO
Data Center Power IndexCAUTION
Est. time to power28.4 months
LocationLansing, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Liquid Web, Inc in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Viettel Tanzania PLC

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 18 operating generating units totalling 992 MW within about 50 km of Lansing, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar630 MW · 15 units · 64%
Oil/Gas361 MW · 3 units · 36%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Lansing tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="liquid-web-inc-liquid-web-inc-74ee1d84" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind