Lepida Data Center

Last updated

Data Center is a data center operated by Lepida in Bologna, BO, IT. The facility is currently operational. It sits in the Bologna data-center market on the ENTSOE-IT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 81.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Bologna
State
BO
Country
IT

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Bologna — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Bologna — the market this facility sits in (full deep-dive →).

Bologna's data center market remains nascent and underdeveloped, with 12 tracked facilities delivering zero operational megawatts—a critical gap for a metropolitan region of 390,000 residents and significant university and research infrastructure. The market is fragmented across multiple small operators, with no single player commanding meaningful scale; the top positions are held by two unnamed operators alongside Cineca the Italian national supercomputing consortium, ECMWF European Centre for Medium-Range Weather Forecasts, and Ehinet Srl, each holding single-facility presence. This operator distribution underscores the absence of regional consolidation and suggests that existing capacity is either highly specialized research-focused or undercapitalized for commercial deployment. The DCPI verdict of AVOID—driven by excess-power availability at only 13/100 and severe constraint scores…

Location

Area Bologna, BO, IT

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBologna
Grid operatorENTSOE-IT
Data Center Power IndexAVOID
Est. time to power81.5 months
LocationBologna, IT

Power generation nearby

DC Hub tracks 67 operating generating units totalling 2,811 MW within about 50 km of Bologna, IT. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,588 MW · 9 units · 92%
Utility-Scale Solar139 MW · 54 units · 5%
Bioenergy41 MW · 2 units · 1%
Hydropower30 MW · 1 unit · 1%
Wind13 MW · 1 unit · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Bologna tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="lepida-data-center-a102ee1d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind