Karlsruhe Institute of Technology (KIT) Scientific Computing Center - KIT CN

Scientific Computing Center - KIT CN is a data center operated by Karlsruhe Institute of Technology (KIT) in Eggenstein-Leopoldshafen, Baden-Württemberg, DE. The facility is currently operational. It sits in the Frankfurt data-center market on the ENTSOE-DE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 117.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Eggenstein-Leopoldshafen
State
Baden-Württemberg
Country
DE

Market intelligence

AVOID

Data Center Power Index verdict for Frankfurt — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Frankfurt — the market this facility sits in (full deep-dive →).

Frankfurt's data center market is fundamentally constrained despite substantial infrastructure. The tracked portfolio spans 308 facilities totaling 2,240 MW across a fragmented operator landscape dominated by Equinix 18 facilities, Digital Realty 17, and an unnamed operator controlling 15 sites. The top-five operator concentration remains loose—no single player exceeds 8% of tracked capacity—suggesting a market still in competitive equilibrium but showing signs of consolidation pressure. The DCPI verdict of AVOID reflects a critical capacity mismatch: excess power stands at only 22/100 while constraints spike to 71/100. This inversion signals severe grid interconnection and infrastructure bottlenecks rather than power supply deficiency. For acquisition-focused investors, this means entry costs will remain elevated as facility operators command premiums to offset connection limitations…

Location

Area Eggenstein-Leopoldshafen, Baden-Württemberg, DE

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketFrankfurt
Grid operatorENTSOE-DE
Data Center Power IndexAVOID
Est. time to power117.6 months
LocationEggenstein-Leopoldshafen, DE

Fiber connectivity

Networks recorded as present at or immediately around Scientific Computing Center - KIT CN in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

BelWüGridKaKIT StudentKarlsruhe Institute of Technology (KIT)

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 207 operating generating units totalling 6,073 MW within about 50 km of Eggenstein-Leopoldshafen, DE. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal3,057 MW · 5 units · 50%
Oil/Gas1,889 MW · 17 units · 31%
Utility-Scale Solar524 MW · 164 units · 9%
Hydropower292 MW · 3 units · 5%
Wind196 MW · 11 units · 3%
Bioenergy105 MW · 4 units · 2%
Geothermal10 MW · 3 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Eggenstein-Leopoldshafen tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="karlsruhe-institute-of-technology-kit-scientific-computing-center-kit-cn-ab0f1a78" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind