DC-T01 iHost.AL is a data center operated by iHost.AL in Tirana, AL, AL. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Montgomery data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 31.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Montgomery — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Montgomery — the market this facility sits in (full deep-dive →).
Montgomery's data center market consists of 8 tracked facilities totaling 310 MW, dominated by Meta's dual presence through both Meta Inc. and Meta Platforms with 6 facilities combined, while diversified operators including Retirement Systems of Alabama and The Houston Bunker round out the roster. The market's constraint score of 50/100 signals moderate friction on land, power, and cooling availability, positioning it as materially tighter than markets with scores in the 30s but notably more constrained than some peer regions. With an excess-power score of just 29/100, Montgomery faces meaningful power scarcity relative to installed capacity—a critical limitation for operators planning incremental load or hyperscaler customers seeking guaranteed headroom. The AVOID verdict reflects a risk-reward asymmetry unfavorable for acquisition-focused investors. A constraint score of 50/100 means…
Published DC Hub data for this location.
Comparable facilities in Tirana tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="ihostal-dc-t01-ihostal-3fd8a68a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=ihostal-dc-t01-ihostal-3fd8a68a