Havard Management 201 Portage

Havard Management

201 Portage is a data center operated by Havard Management in Winnipeg, MB, CA. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Winnipeg data-center market on the MH grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 7.7-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
3.0 MW
Status
Operational
Market
Winnipeg
State
MB
Country
CA
Coordinates
49.8957, -97.1393

Market intelligence

CAUTION

Data Center Power Index verdict for Winnipeg — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Winnipeg — the market this facility sits in (full deep-dive →).

Winnipeg's data center market remains small and fragmented, with 12 tracked facilities totaling 39 MW spread across six operators. LES.NET 1996 INC leads with three facilities, while Equinix operates two, and the University of Winnipeg and Havard Management each control one additional site. The market shows a surplus power position 50/100 on the DCPI excess-power metric but faces a significant constraint rating of 23/100, indicating that while generation capacity exists, distribution infrastructure or grid access limitations restrict its utility for new deployments. The CAUTION verdict reflects a paradoxical market condition: investors encounter adequate raw power availability but insufficient operational flexibility to deploy it effectively. The 23/100 constraint score signals that power bottlenecks—whether transmission, distribution, or interconnection delays—will frustrate scaling…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketWinnipeg
Grid operatorMH
DC Hub Power IndexCAUTION
Est. time to power7.7 months
LocationWinnipeg, CA
Reported capacity3.0 MW

Other data centers nearby

Comparable facilities in Winnipeg tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 17,000+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="havard-management-201-portage-bf1b7052" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=havard-management-201-portage-bf1b7052