HALLAG Kommunal GmbH Datencenter 1 - Hall in Tirol

Datencenter 1 - Hall in Tirol is a data center operated by HALLAG Kommunal GmbH in Hall in Tirol, AT. The facility is currently operational. It sits in the Munich data-center market on the ENTSOE-DE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 79.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Hall In Tirol
City
Hall in Tirol
Country
AT

Market intelligence

AVOID

Data Center Power Index verdict for Munich — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Munich — the market this facility sits in (full deep-dive →).

Munich's data center market remains undersized and constrained, with 87 tracked facilities delivering just 6 MW of capacity across a fragmented operator base. Equinix dominates with four facilities, while Eunetworks, EdgeConneX, and Finanz Informatik each operate two sites. Despite being Germany's second-largest city and a major tech hub, Munich's installed base is negligible compared to Frankfurt and Berlin, reflecting decades of underinvestment in purpose-built colocation infrastructure. Recent development signals—including Equinix's completion of its MU4 expansion and M-net's commitment to a new site opening in 2028—suggest movement, but from a minimal baseline. The DCPI verdict of AVOID is decisive for acquisition-focused investors. The excess-power score of 22/100 indicates severe undersupply; available power capacity is scarce and will constrain operations immediately. The…

Location

Area Hall in Tirol, AT

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMunich
Grid operatorENTSOE-DE
Data Center Power IndexAVOID
Est. time to power79.5 months
LocationHall in Tirol, AT

Fiber connectivity

Networks recorded as present at or immediately around Datencenter 1 - Hall in Tirol in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Citynet ATCitynet AT - BACKUP Networknext layer

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 14 operating generating units totalling 2,222 MW within about 50 km of Hall in Tirol, AT. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Hydropower2,208 MW · 10 units · 99%
Utility-Scale Solar14 MW · 4 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON