Google

Last updated

Google is a data center in Midlothian, TX, US. The facility is currently operational. It sits in the Midlothian data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 32.0-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Status
Operational
Market
Midlothian
State
TX
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

BUILD

Data Center Power Index verdict for Midlothian — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Midlothian — the market this facility sits in (full deep-dive →).

Midlothian hosts three operational facilities totaling 425 MW, establishing a modest but growing computational footprint in the region. Google dominates the operator landscape with all three tracked facilities under its control, concentrating both capacity and strategic direction. The market has registered no recent M&A activity, suggesting either stability among existing owners or limited secondary market liquidity. This narrow operator base contrasts with larger competitive markets where multiple players drive price discovery and alternative expansion pathways. The DCPI verdict of BUILD, driven by an excess-power score of 65/100 paired with a moderate constraint rating of 43/100, signals genuine development opportunity. The high excess-power metric indicates regional grid availability and utility willingness to absorb new load—essential for colocation and hyperscaler operations. The…

Location

Area Midlothian, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMidlothian
Grid operatorERCOT
Data Center Power IndexBUILD
Est. time to power32.0 months
LocationMidlothian, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Google in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Google LLC

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 26 operating generating units totalling 6,049 MW within about 50 km of Midlothian, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas5,531 MW · 16 units · 91%
Utility-Scale Solar518 MW · 10 units · 9%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Midlothian tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="google-midlothian-194d2940" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind