Ovio is a data center operated by GNC-Alfa in Աբովյան, AM. It carries a reported power capacity of 5.0 MW and is currently operational.
Source: OpenStreetMap · As of: · Basis: cited (what this means)
The closest tracked facility is AIC, about 12 km away.
Published DC Hub data for this location.
DC Hub tracks 68 operating generating units totalling 2,369 MW within about 50 km of Աբովյան, AM. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="gnc-alfa-ovio-da4b3375" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect