FIBERTOWN Houston Data Center is a data center operated by FIBERTOWN in Houston, TX, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Houston data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 64.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Houston — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Houston — the market this facility sits in (full deep-dive →).
Houston's data center market comprises 63 tracked facilities totaling 1,063 MW across a fragmented operator base, with a DCPI verdict of CAUTION driven by an excess-power score of 65/100 offset by a moderate constraint score of 57/100. CyrusOne and DataBank each operate five facilities, establishing themselves as the market's largest players, while ServerFarm 4 facilities and two smaller operators round out the competitive landscape. The most recent significant transaction—I Squared Capital's $225 million acquisition—included a Houston facility, signaling continued investor interest despite mixed market signals. CenterPoint Energy's commitment to energize up to 8 GW of data center load across Greater Houston by 2029 indicates substantial planned capacity expansion, though the timeline extends into the medium term. The CAUTION verdict reflects a market in tension: excess power…
Published DC Hub data for this location.
Comparable facilities in Houston tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="fibertown-fibertown-houston-data-center-63b20319" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=fibertown-fibertown-houston-data-center-63b20319