Expedient Tidepoint

Last updated

Expedient Tidepoint is a data center operated by Expedient in Baltimore, MD, US. The facility is currently operational. It sits in the Baltimore data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 14.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Baltimore
State
MD
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Baltimore — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Baltimore — the market this facility sits in (full deep-dive →).

Baltimore's data center infrastructure remains underdeveloped at 8 MW across 33 tracked facilities, limiting both scale and competitive positioning. The market is fragmented among five primary operators, with Expedient leading by facility count 3 sites but no single player commanding dominant capacity. The operator base—Expedient, AiNET, TierPoint, and a cluster of smaller providers—reflects a typical mid-market structure lacking the consolidated efficiency seen in major hubs like Washington, DC, where Equinix and CoreSite control supply. The DCPI verdict of excess-power 34/100 and constraint 28/100 signals a market to avoid for growth-stage investment. These paired scores indicate moderate power availability without the reliability assurance investors require; the low constraint score suggests limited headroom for capacity expansion without infrastructure upgrades. Unlike dormant…

Location

Area Baltimore, MD, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBaltimore
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power14.9 months
LocationBaltimore, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 126 operating generating units totalling 5,362 MW within about 50 km of Baltimore, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,153 MW · 12 units · 59%
Coal1,370 MW · 2 units · 26%
Hydropower531 MW · 1 unit · 10%
Utility-Scale Solar248 MW · 110 units · 5%
Bioenergy60 MW · 1 unit · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Baltimore tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="expedient-expedient-tidepoint-256eb743" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind