EXA Edge DC Leipzig

EXA Edge DC Leipzig is a data center operated by EXA Infrastructure in Leipzig, DE. The facility is currently operational. It sits in the Berlin data-center market on the ENTSOE-DE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 84.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Leipzig
Country
DE

Market intelligence

AVOID

Data Center Power Index verdict for Berlin — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Berlin — the market this facility sits in (full deep-dive →).

Berlin's data center market comprises 98 tracked facilities totaling 151 MW across a fragmented operator base, with Vantage Data Centers holding the largest footprint at five facilities. The market is characterized by distributed ownership, with the top four named operators controlling only 14 facilities combined, suggesting significant long-tail participation from smaller regional players and anonymous entities. This atomized structure reflects Berlin's role as a secondary European data center hub rather than a consolidated investment destination. The DCPI verdict of AVOID is unambiguous for acquisition-focused investors. With excess power scoring just 23/100 against a constraint rating of 67/100, Berlin presents a fundamentally constrained growth environment where supply-side expansion faces material headwinds. The severe constraint rating—nearly three times higher than the power…

Location

Area Leipzig, DE

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBerlin
Grid operatorENTSOE-DE
Data Center Power IndexAVOID
Est. time to power84.6 months
LocationLeipzig, DE

Power generation nearby

DC Hub tracks 538 operating generating units totalling 7,962 MW within about 50 km of Leipzig, DE. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal2,883 MW · 5 units · 36%
Utility-Scale Solar2,321 MW · 441 units · 29%
Wind1,482 MW · 73 units · 19%
Oil/Gas1,227 MW · 17 units · 15%
Bioenergy50 MW · 2 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Leipzig tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="exa-infrastructure-exa-edge-dc-leipzig-9d265cd9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind