Equinix NY1 - New York, Newark is a data center operated by Equinix in Newark, NJ, US. It carries a reported power capacity of 18.0 MW and is currently operational. It sits in the Newark data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 25.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Newark — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Newark — the market this facility sits in (full deep-dive →).
Newark's data center market comprises 13 tracked facilities totaling 78 MW across a fragmented operator base, with Crown Castle Inc., DataBank two entities, and Digital Space Group Limited each holding single-facility positions. The DCPI framework assigns the market an excess-power score of 34/100 and infrastructure constraint score of 37/100, placing Newark firmly in AVOID territory. This dual-constraint profile—meaningful oversupply paired with infrastructure limitations—creates a structural mismatch that undermines near-term investment returns. For acquisition-focused buyers, the AVOID verdict is categorical. Excess-power readings of 34 indicate that incremental demand absorption cannot reliably offset acquisition multiples; the market lacks sufficient organic load growth to justify M&A entry at current pricing. The infrastructure constraint ceiling of 37 compounds this risk: even if…
Published DC Hub data for this location.
Comparable facilities in Newark tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="equinix-ny1-new-york-newark-5c6f87d3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=equinix-ny1-new-york-newark-5c6f87d3