Equinix CU1/CU2/CU3/CU4 - Culpeper is a data center operated by Equinix in Culpeper, VA, US. It carries a reported power capacity of 18.0 MW and is currently operational. It sits in the Culpeper data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 45.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Culpeper — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Culpeper — the market this facility sits in (full deep-dive →).
Culpeper's data center footprint remains modest at 234 MW across seven tracked facilities, with Equinix commanding operational dominance through four separate assets. The market lacks geographic diversification: a single operator controls the majority of capacity, creating both dependency and limited competitive tension. No recent M&A activity has been recorded, and the absence of deal flow contrasts sharply with adjacent Virginia markets where Digital Realty, Amazon, and Aligned Data Centers have deployed billions in capital. The DCPI verdict of AVOID is structurally definitive for acquisition-focused investors. While the excess-power score of 37/100 suggests marginal capacity availability, the constraint rating of 54/100 signals binding infrastructure bottlenecks that will prevent buyers from monetizing that power. This combination—available electrons paired with disabled delivery…
Published DC Hub data for this location.
Comparable facilities in Culpeper tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="equinix-cu1cu2cu3cu4-culpeper-a374a978" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=equinix-cu1cu2cu3cu4-culpeper-a374a978