Unverified directory listing — This record came from a third-party directory listing that DC Hub has not verified against another source. It is shown for reference only; its status and details are unconfirmed.
Enzu Mia1 is a data center operated by Enzu in Miami, US. It sits in the Miami data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Miami — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Miami — the market this facility sits in (full deep-dive →).
Miami's data center infrastructure remains constrained and undersized relative to regional demand. The market encompasses 138 tracked facilities totaling 23 MW across a fragmented operator base, with Equinix commanding the largest footprint at seven facilities combined. This minimal capacity density—less than 0.17 MW per facility on average—underscores why the market has historically struggled to attract hyperscale investment and why recent activity has centered on smaller regional consolidators rather than tier-one acquirers. The DCPI verdict of AVOID reflects a market fundamentally misaligned with investor risk tolerance. An excess-power score of 43/100 signals insufficient headroom for demand absorption, while a constraint score of 44/100 indicates material limitations in physical space, cooling capacity, or backhaul infrastructure. For acquisition-focused buyers, this combination…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Miami tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="enzu-mia1-miami-786f2c35" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect