Encompass Minneapolis Facility

Last updated

Encompass Minneapolis Facility is a data center operated by Encompass in Lino Lakes, MN, US. The facility is currently operational. It sits in the Minneapolis data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 20.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Minneapolis-St Paul
City
Lino Lakes
State
MN
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Minneapolis — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Minneapolis — the market this facility sits in (full deep-dive →).

Minneapolis operates at near-equilibrium with balanced power supply and demand constraints that eliminate margin opportunity for new entrants. The market comprises 89 tracked facilities delivering 95 MW of total capacity, with Cologix commanding the largest operator footprint at 7 facilities, followed by DataBank at 6. The DCPI scores—45/100 for excess power and 46/100 for constraint—indicate neither surplus nor acute shortage; this symmetry is the problem. The dual-constraint verdict of AVOID applies specifically to greenfield development and acquisition at elevated valuation. Investors cannot exploit power premiums excess-power score signals no surplus pricing power nor can they justify greenfield capex on the premise of filling constrained capacity. The market lacks the asymmetry that generates returns: no power glut justifies discounted wholesale pricing, and no acute power scarcity…

Location

Street Holly Drive
Area Lino Lakes, MN, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMinneapolis
Grid operatorMISO
Data Center Power IndexAVOID
Est. time to power20.8 months
LocationLino Lakes, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 150 operating generating units totalling 3,978 MW within about 50 km of Lino Lakes, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,976 MW · 11 units · 75%
Coal598 MW · 1 unit · 15%
Utility-Scale Solar301 MW · 134 units · 8%
Bioenergy100 MW · 3 units · 3%
Wind2 MW · 1 unit · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Lino Lakes tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="encompass-encompass-minneapolis-facility-c0e80ee7" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind