EdgeCore is a data center in Mesa, AZ, US. The facility is currently operational. It sits in the Mesa data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 13.2-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Mesa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Mesa — the market this facility sits in (full deep-dive →).
Mesa's data center market is moderately developed with 53 tracked facilities representing 1,431 MW of capacity, but remains fragmented across numerous operators with no clear market leader. The top-5 operators control only 19 facilities combined, with 13 facilities attributed to unknown operators, indicating a highly distributed competitive landscape. EdgeCore Digital Infrastructure and EdgeCore collectively operate 8 facilities, while Meta maintains a smaller 3-facility footprint in the region. The DCPI verdict of BUILD reflects a market positioned favorably for greenfield development rather than acquisition. With an excess-power score of 69/100 against a constraint score of 44/100, Mesa presents sufficient grid capacity and power availability to support new construction without the infrastructure bottlenecks plaguing capacity-constrained markets. This profile favors operators and…
Published DC Hub data for this location.
Comparable facilities in Mesa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="edgecore-1f9fb631" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=edgecore-1f9fb631