EdgeConneX Tallahassee (EDCTAL01)

EdgeConneX

EdgeConneX Tallahassee (EDCTAL01) is a data center operated by EdgeConneX in Tallahassee, FL, US. The facility is currently operational. It sits in the Jacksonville data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Tallahassee
State
FL
Country
US
Coordinates
30.4720, -84.3532
Address
1531 Commonwealth Business Dr.

Market intelligence

AVOID

Data Center Power Index verdict for Jacksonville — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Jacksonville — the market this facility sits in (full deep-dive →).

Jacksonville's data center market comprises 35 tracked facilities totaling 39 MW, with Flexential leading operator share at five facilities, followed by Cologix with four sites and CenturyLink Jacksonville with two. The market is fragmented, with no single operator commanding dominant position, and shows modest scale relative to major U.S. metropolitan hubs. This fragmentation reflects a secondary-tier market lacking the infrastructure density or anchor tenant concentration that drives consolidation. The DCPI verdict of AVOID carries direct implications for acquisition-stage investors: an excess-power score of 41/100 signals that available spare generation capacity is below median threshold, while a constraint rating of 44/100 indicates moderate but material limits on infrastructure expansion headroom. Together, these metrics suggest that buyers entering Jacksonville face both near-term…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketJacksonville
Grid operatorFRCC
DC Hub Power IndexAVOID
Est. time to power16.7 months
LocationTallahassee, US

Power generation nearby

DC Hub tracks 15 operating generating units totalling 1,692 MW within about 50 km of Tallahassee, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas944 MW · 5 units · 56%
Utility-Scale Solar704 MW · 9 units · 42%
Hydropower44 MW · 1 unit · 3%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Tallahassee tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-tallahassee-edctal01-475388dc" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-tallahassee-edctal01-475388dc
Schema, units and the population behind every count: https://dchub.cloud/bind