EdgeConneX San Diego (EDCSDG01)

EdgeConneX

EdgeConneX San Diego (EDCSDG01) is a data center operated by EdgeConneX in San Diego, CA, US. The facility is currently operational. It sits in the San Diego data-center market on the CAISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 41.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
City
San Diego
State
CA
Country
US
Coordinates
32.8405, -117.1684
Address
5761 Copley Dr

Market intelligence

CAUTION

Data Center Power Index verdict for San Diego — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on San Diego — the market this facility sits in (full deep-dive →).

San Diego's data center market comprises 48 tracked facilities across six operators, with EdgeConneX, DataBank, and Cogent Communications each maintaining meaningful regional presence. The market's dual constraint—an excess-power score of 62/100 paired with operational constraints at 57/100—signals a fundamental tension between raw capacity and usability. Notably, total MW capacity remains unmeasured in current tracking, suggesting either nascent infrastructure development or data collection gaps that warrant investor scrutiny. The CAUTION verdict reflects a market where power availability does not automatically translate to deployable capacity. A constraint rating of 57/100 indicates that 43% of the market's friction stems from non-power factors: interconnection delays, real estate availability, permitting timelines, or existing tenant lock-in. For acquisition-focused buyers, this…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketSan Diego
Grid operatorCAISO
DC Hub Power IndexCAUTION
Est. time to power41.0 months
LocationSan Diego, US

Power generation nearby

DC Hub tracks 51 operating generating units totalling 3,265 MW within about 50 km of San Diego, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,202 MW · 22 units · 98%
Utility-Scale Solar63 MW · 29 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in San Diego tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-san-diego-edcsdg01-83a5b314" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-san-diego-edcsdg01-83a5b314
Schema, units and the population behind every count: https://dchub.cloud/bind