EdgeConneX Houston (EDCHOU01)

EdgeConneX

EdgeConneX Houston (EDCHOU01) is a data center operated by EdgeConneX in Katy, TX, US. The facility is currently operational. It sits in the Katy data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 55.7-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
City
Katy
State
TX
Country
US
Coordinates
29.7946, -95.7451
Address
1510 Primewest Parkway

Market intelligence

CAUTION

Data Center Power Index verdict for Katy — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Katy — the market this facility sits in (full deep-dive →).

Katy's data center footprint remains modest but fragmented, with 100 MW distributed across five tracked facilities operated by five separate entities—EdgeConneX two facilities, Element Critical, ServerFarm, and Skybox each holding single assets. The market's excess-power score of 65/100 suggests adequate generation capacity relative to current demand, but this advantage is substantially offset by a constraint score of 53/100, indicating meaningful infrastructure bottlenecks in transmission and distribution that will limit rapid scaling. The operator roster shows no dominant player, creating a highly atomized competitive structure typical of emerging secondary markets. The DCPI verdict of CAUTION carries direct implications for acquisition-stage investors: power availability alone cannot justify entry. While excess generation capacity might appear favorable, the constraint score signals…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketKaty
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power55.7 months
LocationKaty, US

Power generation nearby

DC Hub tracks 55 operating generating units totalling 9,820 MW within about 50 km of Katy, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas5,743 MW · 41 units · 58%
Coal2,697 MW · 4 units · 27%
Utility-Scale Solar1,379 MW · 10 units · 14%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Katy tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-houston-edchou01-b494184d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-houston-edchou01-b494184d
Schema, units and the population behind every count: https://dchub.cloud/bind