EdgeConneX Detroit (EDCDET01)

EdgeConneX

EdgeConneX Detroit (EDCDET01) is a data center operated by EdgeConneX in Southfield, MI, US. The facility is currently operational. It sits in the Southfield data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 30.2-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
City
Southfield
State
MI
Country
US
Coordinates
42.4485, -83.2612
Address
21005 Lahser Rd

Market intelligence

CAUTION

Data Center Power Index verdict for Southfield — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Southfield — the market this facility sits in (full deep-dive →).

Southfield's data center footprint remains modest and fragmented, with 12 tracked facilities totaling 8 MW across a dispersed operator base. The market is dominated by smaller regional players: 123.Net, LLC operates the largest presence with 3 facilities, while ManagedWay Company, 365 Data Centers, and EdgeConneX each run 2 facilities apiece, with EdgeConneX Inc. adding one additional site. The absence of recent M&A activity underscores a market that has not yet attracted consolidation-stage interest, despite Michigan's broader emergence as a hyperscale AI data center hub—evidenced by major capacity expansions and Oracle and Google partnerships elsewhere in the state. The DCPI verdict of CAUTION reflects a market caught between competing constraints. An excess-power score of 58/100 indicates adequate but not abundant available capacity, while a constraint score of 55/100 signals that…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketSouthfield
Grid operatorMISO
DC Hub Power IndexCAUTION
Est. time to power30.2 months
LocationSouthfield, US

Power generation nearby

DC Hub tracks 31 operating generating units totalling 2,645 MW within about 50 km of Southfield, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,108 MW · 14 units · 80%
Wind287 MW · 6 units · 11%
Utility-Scale Solar240 MW · 10 units · 9%
Bioenergy10 MW · 1 unit · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Southfield tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-detroit-edcdet01-66cbabe4" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-detroit-edcdet01-66cbabe4
Schema, units and the population behind every count: https://dchub.cloud/bind