EdgeConneX Denver (EDCDEN01)

EdgeConneX

EdgeConneX Denver (EDCDEN01) is a data center operated by EdgeConneX in Englewood, CO, US. The facility is currently operational. It sits in the Englewood data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 12.2-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
City
Englewood
State
CO
Country
US
Coordinates
39.5611, -104.8267
Address
8535 Highfield Pkwy

Market intelligence

CAUTION

Data Center Power Index verdict for Englewood — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Englewood — the market this facility sits in (full deep-dive →).

Englewood's data center footprint remains nascent, with 15 tracked facilities representing zero operational megawatts—a market still in early-stage infrastructure development. The operator base is fragmented across five entities, with Flexential holding the largest presence at two facilities, while EQUINIX LLC, DataBank, and Centersquare each operate single sites. This distributed ownership structure reflects a market where no single player has yet established dominant control, leaving room for consolidation or strategic entry by larger regional operators. The DCPI verdict of CAUTION reflects a delicate equilibrium that investors must parse carefully. The excess-power score of 57/100 signals moderate availability, but the constraint rating of 40/100 presents material friction—suggesting that while power supply exists, distribution infrastructure, interconnection timelines, or regulatory…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketEnglewood
Grid operatorWECC
DC Hub Power IndexCAUTION
Est. time to power12.2 months
LocationEnglewood, US

Power generation nearby

DC Hub tracks 58 operating generating units totalling 2,249 MW within about 50 km of Englewood, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,985 MW · 9 units · 88%
Utility-Scale Solar264 MW · 49 units · 12%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Englewood tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-denver-edcden01-c10bc806" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-denver-edcden01-c10bc806
Schema, units and the population behind every count: https://dchub.cloud/bind